6 steps to your gas connection

  • 1
    Submitting<br>your request

    Submitting
    your request

  • 2
    Fixing the<br>conditions

    Fixing the
    conditions

  • 3
    Carrying out<br>connection<br>work

    Carrying out
    connection
    work

  • 4
    Making<br>the gas<br>connection

    Making
    the gas
    connection

  • 5
    Notifying end<br>of work on<br>installation

    Notifying end
    of work on
    installation

  • 6
    Creos<br>fits the <br>meter

    Creos
    fits the
    meter

Step 5: Notification of completion of installation works

    • It is your responsibility to ensure that the civil engineering work relating to the connection works are completed before the date of the meter replacement (the trench is properly sealed, the wall openings of the service connections are sealed, etc.)