6 steps to your gas connection

  • 1
    Submitting<br>your request

    Submitting
    your request

  • 2
    Fixing the<br>conditions

    Fixing the
    conditions

  • 3
    Carrying out<br>connection<br>work

    Carrying out
    connection
    work

  • 4
    Making<br>the gas<br>connection

    Making
    the gas
    connection

  • 5
    Notifying end<br>of work on<br>installation

    Notifying end
    of work on
    installation

  • 6
    Creos<br>fits the <br>meter

    Creos
    fits the
    meter

Step 6: Re-installation of the meter by Creos

Verification of the installation's compliance by Creos

Your fitter must certify the correct execution of the installation using the Compliance certificate duly filled in and signed. The Creos agent will ensure the compliance of the installation before installing the meter.

Re-installation of the meter

Once the installation is certified and verified as compliant Creos will re-install the meter.

Billing and contract

Once the meter has been re-installed, you will receive an invoice by post for the work performed and, if applicable, a new grid usage contract which you must promptly return to Creos.

    • The presence of your fitter is required when re-installing the meter.
    • Your presence is also required to sign the grid access contract. If this is not possible, you may authorise a person of confidence to sign.
    • Should the installation be non-compliant the meter will not be re-installed.
    • Any additional visit will be invoiced at the current price.