… associated capability curve; d. the auxiliary load of the generation unit representing the internal demand of the generation unit shall be modelled as a non-conforming load at the connection point of the…
… the bank shall pay automatically without any other condition than the receipt of a written demand by registered letter from the single allocation platform.; (f) the bank guarantee shall be…
… the bank shall pay automatically without any other condition than the receipt of a written demand by registered letter from the Single Allocation Platform. (f) the Bank Guarantee shall be irrevocable,…
… the bank shall pay automatically without any other condition than the receipt of a written demand by registered letter from the Single Allocation Platform. (f) the Bank Guarantee shall be irrevocable,…
… the bank shall pay automatically without any other condition than the receipt of a written demand by registered letter from the Allocation Platform. (f) the Bank Guarantee shall be irrevocable,…
… power park module at the time of installation, nor installed for the purpose of connecting a demand facility; (4) ‘HVDC converter station’ means part of an HVDC system which consists of one or more HVDC…
… of the network elements and services that impact their activities. Especially relevant is the global demand-generation balance through the procurement of balancing services and activation of balancing energy…
… to require changes in the active power production or consumption of power generating modules and demand units within their respective areas to reduce the FRCE as specified in paragraph 16. 13. For the CE…
… may result from an instantaneous change of active power of a single power generating module, single demand facility, or single HVDC interconnector or from a tripping of an AC line within the DE area in each…
… TSOs participating in the coordination of operational security analysis on a voluntary basis have demonstrated objective compliance with the requirements set out in (a), (b), (c), and (d), the TSOs referred…