6 steps to your gas connection
Step 6: Installing the meter by Creos
Verification of the installation's compliance by Creos
Your fitter must certify the correct execution of the installation using the Compliance certificate duly filled in and signed. The Creos agent will ensure the compliance of the installation before installing the meter.
Installation of the meter by Creos
Once the certified installation is verified as compliant, Creos will proceed to install the meter.
Billing and contract
After Installation of the meter, you will receive by mail an invoice for both the meter installation and the grid usage contract, which you must return promptly to Creos.
- The presence of your fitter is required during the installation of the meter.
- If the installation is non-compliant the meter will not be installed.
- Any additional visit will be invoiced at the current price.