I no longer use gas

Are you no longer using natural gas? Are you demolishing your building? Create your request easily in just a few steps via your myCreos customer space.

Starting my request

myCreos customer?

If you already have a user account, log in directly to your customer space to start your request.

New customer?

Are you a new customer or have you not yet registered with mycreos.net? Then complete the registration form to receive your username and password.

If you no longer wish to use gas, you have two options:

Option 1: Removing the meter

Meter removal can be requested by the network user/consumer/tenant, but requires the signature of the connection holder/owner.

 

In all cases, the re-commissioning of a gas installation will require certification of the conformity of the installation by a Luxembourg-approved installer.

Option 2: Separation of the connection from the network

Disconnecting a connection is irreversible and will deprive all users of the building of gas. It cannot be carried out if there are still gas installations (gas meters) in use in the building.

 

Connection disconnection can only be requested by the lessee/owner.

I've just submitted my application via my mycreos customer space. What are the next steps?

Feasibility check

Creos has received your request for a new connection. We check that your request is complete and technically feasible. If you have any questions, we will contact you.
Once your request has been approved, we invite you to arrange a meeting on site.

Details

During the on-site appointment, the Creos agent will take a detailed look at the premises to define the terms and conditions and agree a date with you for the disconnection of the connection.

Disconnection by Creos

If the connection is disconnected (Option 2), the civil engineering work is the responsibility of the applicant. Your contractor must make an appointment with Creos to disconnect the connection from the network.

Civil engineering work is not required for meter removal (Option 1).

Creos will carry out the work requested - meter removal (Option 1) or separation of the connection (Option 2) - on the agreed date.

  • You must be assisted by an ALUGAZ-certified contractor to carry out the civil engineering work.
  • The separation pit on the main pipe must be ready on the date agreed with your contractor.
  • You must be present when the meter is removed.