Connection & Grid Utilisation (TSO)

 

Connection to the natural gas transmission network

The General and Special Connection Conditions constitute the Natural Gas Transmission Connection Contract, the purpose of which is to regulate the relationship between the TSO and the Connection Taker in accordance with Article 9 (4) of the Law of 1st August 2007.

The General Terms and Conditions define:

  • the respective commitments and responsibilities of the TSO and the Licensee with regard to the Connection Facility;

  • access to the site of the connection facility;

  • operation and maintenance of the connection facility;

  • modifications to the Connection Facility;

  • operational instructions.

The special conditions determine:

  • the location of the connection facility;

  • the location of the supply point;

  • the contractual pressure(s):

    • guaranteed contractual pressure upstream of the supply point;

    • nominal pressure of the downstream facility;

  • maximum withdrawal capacity;
  • the number of the metering point.

Utilisation of the natural gas transmission network

The general and special conditions of use constitute the Contract for Use of the Gas Transmission System, the purpose of which is to regulate the relationship between the TSO and an End Customer, in accordance with Article 29(6) of the Law of 1 August 2007.

The general terms and conditions define:

  • the respective commitments and responsibilities of the TSO and the customer relating to the natural gas withdrawal service on the Luxembourg transmission system;

  • the natural gas delivery characteristics (WOBBE index, relative density, etc.);

  • security of supply requirements;

  • the procedures for determining the quantities of natural gas delivered (measuring device), pricing and invoicing (supplier default);

  • default supply and supply of last resort;

  • the rules applicable to the processing of economically sensitive data.

The special conditions determine:

  • the customer's supply point(s);

  • the identification number of the metering point;

  • the contractual service pressure downstream of the supply point;

  • the minimum and maximum hourly flows > adaptation of the metering device.

Documents to download

Conditions générales de raccordenement au réseau de transport de gaz naturel du Grand-Duché de Luxembourg

384 KB

Conditions particulières de raccordement au réseau de transport de gaz naturel du Grand-Duché de Luxembourg

43 KB

Conditions générales d'utilisation du réseau de transport de gaz naturel au Grand-Duché de Luxembourg

377 KB

Conditions particulières d'utilisation du réseau de transport de gaz naturel au Grand-Duché de Luxembourg

376 KB

View all Documents