Core CCR TSOs’ proposal for the regional design of long-term transmission rights in accordance with Article 31 of Commission Regulation (EU) 2016/1719 13 April 2017 Table of Contents Whereas
ACER Decision on SPBC: Annex I Methodology for a list of standard products for balancing capacity for frequency restoration reserves and replacement reserves in accordance with Article 25(2) of
Proposal of all TSOs of the LFC Block TNG+TTG+AMP+50HZT+EN+CREOS concerning coordination actions aiming to reduce FRCE in accordance with Article 152(14) and Article 152(16) of Commission Regulation
Annex I of the ACER Decision on the Methodology for pricing intraday cross-zonal capacity Methodology for pricing intraday cross-zonal capacity 24 January 2019 Page 1 of 8 Table of Contents
1 European Network of Transmission System Operators for Electricity THE ENERGY IDENTIFICATION CODING SCHEME (EIC) REFERENCE MANUAL 2022-02-01 VERSION 5.5 ENTSO-E | Rue de Spa, 8 | 1000 Brussels |
1 European Network of Transmission System Operators for Electricity THE ENERGY IDENTIFICATION CODING SCHEME (EIC) REFERENCE MANUAL 2018-05-08 VERSION 5.3 ENTSO-E AISBL • Avenue de Cortenbergh,